A hall and library at Safi school were being modernised and could be used from the next scholastic year. The hall could be used by some 300 persons simultaneously and would be equipped with all the equipment needed for drama, music, meetings and other activities.
Backstage facilities and changing rooms had also been built alongside the hall, together with a foyer and a library. The work being done in the school would be costing close to Lm200,000.