“With the ever-increasing fuel and energy costs, we should be thankful that BMS technology has arrived when it has... as never has an effective energy-reducing solution been more necessary”, said Ing. Anthony Bartolo, general manager of Advanced Industrial Systems (AIS) Ltd at a recent seminar.
A common problem being faced by managers of large buildings is the seemingly runaway costs associated with energy consumption. How does one go about stopping buildings from wasting energy, wastage which directly eats away the profits of any given organisation?
Taking part in the seminar was the Spanish independent consultant, Eng. Fernando Cuesta, who has many years’ experience in energy management. He explained how energy wastage in buildings could be drastically reduced by means of a professionally designed building management system (BMS). He explained what constitutes a well designed BMS and detailed some of the techniques involved.
Eng. Cuesta detailed how building management systems should be specified in order to give the best return on investments. A professional BMS, as opposed to some electronic gadgets and toys, is capable of offering 20-30 per cent savings in energy bills, with a typical payback period of two to three years. As examples, he cited the recently opened Heathrow Terminal 5 and the Sigonella military airbase where properly designed and installed systems were used to provide significant energy savings. Both these major projects have been implemented using Trend controls.
Domenico Di Canosa, Trend area manager responsible for the Mediterranean Region, explained how Trend had managed to build a special relationship with system integrators all over the world and expressed his satisfaction that AIS had developed its own room energy management system using the Trend controller at its heart, a system which has been successfully deployed at the 5-star The Palace Hotel, in Sliema.
For information on how to stop energy wastage contact AIS on 2180-3350 or [email protected]