Malta International Airport has just completed re-construction of Taxiways Alpha and Bravo which form a holding loop at the threshold of Runway 31.
This runway heads into the predominant north-westerly wind direction, and is thus MIA’s main take-off and landing runway, carrying approximately 60 per cent of all movements annually. The runway does not have a parallel taxiway and this requires aircraft to back track Runway 31 prior to take-off. The Alpha Bravo taxiway loop is consequently a significant complement to the principal runway’s infrastructure.
It primarily provides air traffic controllers with the means to interface aircraft movements more efficiently by utilising short duration opportunities to taxi and hold aircraft close to the runway threshold between landings on the respective runway. This has a dramatic effect on reducing aircraft taxi times and hence aircraft fuel consumption on the ground. Its layout and location also provides a route for heavy aircraft turnouts prior to takeoff, which would otherwise be impossible on a 60m runway without significant wear or damage to the pavement surface.
Malta International Airport is highly susceptible to seasonal fluctuations which are typically characterised by peak aircraft operations alternating against periods of low aircraft movements. The situation places much higher demands on the ability of the aerodrome infrastructure to consistently and efficiently handle aircraft movements without capacity restrictions. This must also be taken in perspective of minimum construction standards required by the International Civil Aviation Organisation (ICAO) to ensure the safety of aircraft movements during landing, take-off and taxiing.
Following its reconstruction, the Alpha and Bravo taxiway system now provide access to any size of aircraft including the massive AN-124 cargo transport, without restrictions. The paved shoulder areas now eliminate any risk associated with debris ingestion by aircraft engines being manoeuvred over grass verges.