Medserv has been awarded two full service logistics contracts, one with STX Heavy Industries of South Korea and one with EMAS-AMC Pte Ltd of Singapore.
The contracts require Medserv to utilise both their Malta base facilities and their Libyan branch in the supply of full logistics and hook-up support services for the installation of the GAZA Floating Storage and Offloading vessel.
Gaza will replace the existing Sloug FSO on Mellitah Oil and Gas' Bouri field, 120 km northwest of Tripoli. Installation and hookup is scheduled to begin Q2 2016.